Skip to content

Loading the globe…

Stanislaus County, California

25,000 acres of what comes next

Secure, isolated and able to run 100% green, within about 25 miles of Silicon Valley.

Copper Canyon · next to Diablo Grande

25,000 acres · Stanislaus County, California

Imagery: NASA, USGS. Terrain: AWS Open Data. Data: © OpenStreetMap contributors.

The ranch

See the ranch

Rolling hills and open sky of the area, filmed from a drone.

Drone cinematography by Douglas Thron. Video hosted on YouTube. Watch on YouTube

Next door: the Diablo Grande community

Copper Canyon sits next to an established community with golf and homes. These facts are about that neighbor, not about the land offered here.

  • 400+

    homes already built

  • 18

    tournament-caliber golf holes, with clubhouse, range and vineyard

  • 2,354

    homes planned in its approved Phase 1 (Oak Flat Village)

  • Built

    its sewer connection to the City of Patterson

Source: the Diablo Grande developer’s brochure (2016 Specific Plan Amendment). Nothing beyond its Phase 1 can be built without a full environmental review.

From the world to the site

Scroll to fly from orbit down to the property.

  • San José & Silicon Valley

    ≈23 mi in a straight line

  • Drone commute

    From San José, the Bay Area and Carmel

  • Interstate 5

    Logistics corridor, ≈6 mi from the site

  • Crows Landing Airport

    Former military airfield with industrial and commercial plans

Illustrative map. Exact boundary to follow with the survey plan.

A scale that is hard to find

25,000acres

Near Patterson, in Stanislaus County. Boundary shown is illustrative until the survey arrives.

Energy

Sun, lines and room to scale

A technical study of the surrounding area found it “highly suitable for solar development”.

Prior technical study · 2009–2010

53MW
MW sized across two phases
More than75M
million kWh a year (phases 1 and 2)
2
phases in the study area
Phase 1 · Copper Canyon13 MW

About 124 acres of ground-mounted panels, in two areas.

Planned tie-in to the Turlock Irrigation District 12 kV line; the study records 13 MW of available capacity there.

Phase 2 · Crow Creek40 MW

Two 20 MW stages on a much larger surface suitable for solar.

PG&E 115 kV transmission lines within 4 miles; interconnection through CAISO.

Phase 1 · Copper CanyonPhase 2 · Crow Creek
Where the study lookedTransmission lines 230 kV+Site · approximate outline

Phase areas are approximate markers placed from the place names in the study, not surveyed footprints and not to scale. The study area is approximate and is not confirmed to match the site outline. Lines: OpenStreetMap.

Since 2010 solar technology has advanced a great deal, lowering costs while raising capacity and efficiency. That could allow an even better use of land like this.

Background from a 2009–2010 study. It is not a current project and does not imply current permits, interconnection rights or contracts; any new development would need an updated study.

Source: “Solar Development Project”, Laurus Corporation and Solar Power Partners, Inc.

Why this land

  • Secure and isolated

    Limited access points make it a natural fit for data centers, banks and government.

  • Can be 100% green

    Nearby transmission lines make large-scale solar possible. A 2009–2010 study sized about 53 MW across two phases.

  • Del Puerto Canyon Reservoir

    Water resources close to the site support agriculture and industry.

  • Crows Landing airport

    A former military airfield with plans for industrial or commercial use.

  • Logistics on the I-5

    Distribution centers operate along the I-5 corridor next to the property.

  • Many possible uses

    Agriculture and microgreens, data centers and solar farms at a scale that is hard to find.

Let's talk

Write or call a person directly. No forms.

Contact person to be confirmedDownload the deck (PDF)

Opens a print-ready version: choose “Save as PDF”.